No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV. RATU OGAN ENGINEERING | 90.207.525.8-331.000 | Rp. 79.717.000,00 | Rp. 79.717.000,00 | Rp. 79.189.000,00 |
No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV. RATU OGAN ENGINEERING | 90.207.525.8-331.000 | Rp. 79.717.000,00 | Rp. 79.717.000,00 | Rp. 79.189.000,00 |